Morning Jog at East End Park
Meetings on the
1st Monday of
Each Month


7:00pm at the new Kingwood Community Center

Capital Improvements <$350,000

These requests are not handled through the 311 system; they are considered Super Neighborhood Action Plan (SNAP) items. They require longer range planning and budgeting.

Requests costing less than $350,000 can be submitted through the Super Neighborhood Council or the City Councilmember.

Examples of projects less than $350,000 include:

Parks

  • Tree planting & maintenance in esplanades ONLY
  • Mulching of esplanades

Traffic

  • Intersection Redesign
    • Includes signal upgrades at intersections (upgrade signals heads, pedestrian heads)
    • Change in traffic hardware (span wire to mast arm)
    • Reconfigure existing intersection

Engineering and Construction

  • Major Thoroughfare Street Overlays (asphalt)
    • Concrete point repair through ROW/M
    • Street will be evaluated prior to acceptance

Planning and Development

  • Amendment/Removal of a Bike Lane/Route
  • Bikeway Signs-crossing signs only on approved bikeways

Right of Way (ROW)/Maintenance

  • Overlay of Neighborhood Streets –excludes concrete streets
  • Concrete Point/Patch Repair –all thoroughfares and local streets (concrete streets only)
  • Structural Flooding (call 311) (reoccurring events can be submitted for local drainage project evaluation)

 


 •  Home  •  Contact  •  What We Do  •  Current Priorities  •  Request Action  •  Status of Projects  •  News  • 
Copyright 2013 Rehak Creative Services